VNI West – Secure the Grid, Protect the Land, Guarantee the Bills

A Sensible Energy Strategy for the November 2026 Victorian Election

Victoria cannot afford the ideological battleground currently dividing the state’s energy debate.

  • The Problem: The Labor Government’s current handling of the 475-kilometre Victoria to New South Wales Interconnector West (VNI West) project has damaged local goodwill and suffered massive cost blowouts, with estimates escalating to between $7.6 billion and $11.4 billion. Conversely, the Liberal-National Coalition’s policy to completely scrap the interconnector leaves a dangerous 1,480 MW generation gap when the Yallourn coal plant closes in mid-2028, threatening skyrocketing electricity prices and severe blackouts.
  • The Sensible Solution: My platform offers a sensible path forward. I reject both the top-down enforcement of the current government and the risky cancellations of the opposition. I will proceed with VNI West under strict conditions: absolute fiscal discipline, legally locked-in farming protections, and an immediate independent cost review.

Key Policy Deliverables

1. Financial Transparency & AEMO Alignment

I will protect Victorian taxpayers from runaway infrastructure debt while delivering on broad national energy commitments.

  • Advocating for a Cost Review: I will advocate for an immediate, independent audit of the current VicGrid VNI West project financials. Construction approvals must be bound to strict, transparent fiscal benchmarks to contain further cost overruns.
  • Broad ISP Commitment: I maintain a general commitment to the Australian Energy Market Operator’s (AEMO) Integrated System Plan (ISP). I support the overarching national vision for an interconnected grid without rigidly tying the progress or funding of one specific local asset to another.
  • Leveraging Federal Low-Cost Financing: The state should renegotiate terms with the federal government to maximize funding from the Clean Energy Finance Corporation’s Rewiring the Nation program, offsetting direct capital costs to state taxpayers.

2. Respecting Landholders & Preserving Clean Energy Hubs

I will push for reforms on how major projects interact with regional communities while protecting the integrity of our future energy network.

  • Maintaining Project Integrity: I support the integrity of VNI West’s planned corridor. I support retaining the integrity of our Renewable Energy Zones (REZs), unlocking crucial transmission capacity for regional wind, solar, and storage hubs.
  • Fair Compulsory Acquisition Framework: I support compulsory acquisition powers where they are strictly needed to avoid catastrophic project delays. However, these powers will be bound to reformed compensation arrangements that genuinely reflect agricultural output losses and biosecurity risks.
  • Abolishing Statutory Access Fines: I advocate for the immediate repeal of the aggressive statutory access rules used against farmers by the Labor Government and the permanent abolition of the $814 access fines levied on landholders who reject preliminary surveys on their property.

3. Annual System Accountability & Energy Security

Victoria must monitor its power supply with rigorous data, treated independently of political cycles.

  • Annual System Adequacy Mandate: Starting in early 2027, I will push for an Annual System Adequacy Review and Statement. This recurring review will transparently track state-wide storage capacity, local grid upgrades, and transmission progress against real-world demand forecasts.
  • Yallourn “Break Glass” Safety Net: The planned closure of the 1,480 MW Yallourn coal plant in mid-2028 is a critical milestone. If the Annual System Adequacy reviews reveal a dangerous grid capacity shortfall, I will trigger a strict “break glass” commercial extension of Yallourn as a temporary safety net to keep the lights on.

Strategic Distinction for Voters

This policy addresses the core vulnerabilities of both major parties to deliver a balanced, reliable grid:

  • Why the Labor Government’s policy fails: Labor has treated regional communities with heavy-handed penalties and allowed project budgets to spin out of control, threatening social licence and taxpayer value.
  • Why the Coalition’s policy fails: The Coalition offers no credible plan to replace 1,480 MW of closing baseload power by mid-2028, exposing businesses and households to catastrophic winter blackouts and high energy bills.
  • The Choice: Vote for a balanced parliament that ensures Victoria transitions safely, tracks grid progress annually, manages taxpayer funds prudently, and safeguards our state’s energy security.


Google backgrounder

The Victoria to New South Wales Interconnector West (VNI West) is a proposed 500 kV double-circuit overhead transmission line designed to connect the electricity grids of Victoria and New South Wales. Spanning roughly 475 kilometres in total, the project links the Western Renewables Link at Bulgana in Victoria to Project EnergyConnect and HumeLink at Dinawan in New South Wales via a new terminal station near Kerang. [1, 2, 3]

Key Project Specifications

  • Total Length and Easement. The route covers approximately 240 kilometres in Victoria and 235 kilometres in New South Wales. Along most of the corridor, the preferred easement is about 70 metres wide. [1, 2, 3]
  • Delivery Partners. The Victorian section is managed by VicGrid alongside development partner Iberdrola Australia. The New South Wales section is being delivered by Transgrid. [1, 2]
  • Grid Purpose. Identified as an actionable project in the Australian Energy Market Operator’s Integrated System Plan, the line aims to unlock renewable energy zones, reduce network congestion, and maintain power reliability as coal-fired generators retire. [1, 2, 3]
  • Cost Estimates. Infrastructure pipeline estimates place the baseline construction cost around $7.6 billion, though cost escalations have driven some wider industry and political estimates up to $11 billion. [1, 2]

Route Overview

  • Victorian Section. Starts at a new terminal station near Bulgana (Northern Grampians Shire), travels north-east past Tragowel, and crosses the Murray River about 30 kilometres north of Kerang near Murrabit. [1, 2, 3, 4]
  • New South Wales Section. Continues from the Murray River border crossing near Murrabit through the Edward River region to the Dinawan substation. It also includes replacing an existing 330 kV transmission line between the Wagga and Gugaa substations. [1, 2]

Current Status and Timeline

  • Victorian Approvals. The Environment Effects Statement (EES) and draft Planning Scheme Amendment are currently on public exhibition until 16 November 2026 via Planning Victoria. An Inquiry and Advisory Committee directions hearing is scheduled for 7 December 2026, with public hearings starting the week of 8 February 2027.
  • New South Wales Approvals. The NSW Environmental Impact Statement (EIS) and Submissions Report are under review by the Department of Planning, Housing and Infrastructure. Final planning approval is expected in late 2026.
  • Construction Target. Major construction is scheduled to run from 2027 through 2030, with full completion targeted for November 2030. [1, 2, 3, 4]

Community and Political Debate

  • Landholder Opposition. Regional farmers and local councils have raised concerns over agricultural disruption, visual impacts, bushfire risks, and the lack of undergrounding options. Tensions escalated following Victorian laws allowing authorised officers to enter private land for surveys with court orders and fines for obstruction.
  • Political Position. Ahead of the November 2026 Victorian state election, the Victorian Coalition and The Nationals pledged to scrap VNI West if elected, citing cost blowouts and community opposition. Energy industry bodies like the Clean Energy Council have warned that cancelling the link could threaten Victoria’s supply security ahead of the 2028 closure of the Yallourn coal power station. [1, 2, 3, 4, 5]

The total estimated cost for the Victoria to New South Wales Interconnector West (VNI West) transmission project stands at approximately $7.6 billion. Driven by global supply chain constraints and domestic inflation, this figure doubled from its early-stage estimates of around $3.6 billion to $3.9 billion. [1, 2]

Due to the complex nature of the build and ongoing regulatory and easement pressures, project operators have noted that the final price tag carries an uncertainty buffer that could push upper estimates as high as $11.4 billion. [1, 2]

Cost Breakdown by State

The capital expenditure for the 500-kilovolt double-circuit line is split roughly evenly across the state border:

  • Victorian Section: $3.87 billion. Managed by VicGrid (who took over development from Transmission Company Victoria), this covers 240 kilometres of line connecting Bulgana to the NSW border. [1, 2]
  • New South Wales Section: $3.70 billion. Developed by Transgrid, this spans the corridor from the Victorian border up to the Dinawan substation. [1, 2]

Project Financing & Commitments

  • Equity & Early Works: Securityholders committed nearly $700 million in equity to advance early NSW works. In Victoria, a $1.6 billion contract was finalized with infrastructure partners Acciona and Genus. [1, 2]
  • Federal Support: The Clean Energy Finance Corporation (CEFC) has provided $120 million for the Victorian early works and $140 million for the NSW early works via the federal Rewiring the Nation program. [1, 2]
  • Landholder Compensation: To secure the 70-metre-wide infrastructure corridor, affected regional landholders are being allocated $56,000 per hectare in easement benefit payments. [1, 2]

The Cost of Cancellation vs. Completion

The economic viability of VNI West remains a major political and consumer debate in Australia:

  • Consumer Bill Impact: Because transmission assets are regulated, Victoria’s share of the infrastructure build is expected to add $2 to $4 per megawatt-hour (MWh) directly to local consumer power bills.
  • The “No Build” Penalty: Independent wholesale market modeling from firms like Energy Networks Australia and Endgame Analytics indicates that scrapping the project would actually result in a net loss for consumers. Without the interconnector to share interstate power, the grid will be forced to rely on more expensive local gas firming. This scenario is projected to drive wholesale electricity prices up by $16 to $20/MWh from 2036 onward, far outstripping the capital savings of canceling the line. [1, 2]